新聞中心
NEWS CENTER
聯(lián)系我們
CONTACTS US
濟(jì)南皓暉建材有限公司,總部位于中國(guó)泉城——山東濟(jì)南,是一家專業(yè)生產(chǎn)銷售石塑電梯門套,仿大理石電梯門套的專業(yè)廠家。皓暉建材在電梯門套生產(chǎn)行業(yè)很多年,憑著優(yōu)質(zhì)的產(chǎn)品質(zhì)量和完善的售后服務(wù),在全國(guó)各地都有我們的工程案例。
我們本著“以質(zhì)量求生存 ,靠管理出效益,憑信譽(yù)贏口碑,以實(shí)干筑輝煌”的經(jīng)營(yíng)理念,公司將立足于當(dāng)代建材現(xiàn)代化發(fā)展前沿,依靠科技、勇于探索,以優(yōu)質(zhì)產(chǎn)品優(yōu)良服務(wù)、信譽(yù)與廣大用戶攜手共創(chuàng)輝煌。
聯(lián)系電話: 15853163650
工廠地址:山東濟(jì)南章丘區(qū)(歡迎廣大客戶來(lái)廠勘察)
行業(yè)新聞
COMPANY NEWS
電梯門套廠家分享安裝流程
2018-05-02 14:07:21 文章來(lái)源:m.75w5.com
Jinan hao CDH building materials manufacturer of elevator door cover share the elevator door cover installation steps, the following details to share to everyone.
First, the elevator door cover surface need simple processing, surface should be dry, water cut is not greater than 8%.
第二、石電梯門套安裝前先挑選好的材質(zhì)。Second, the elevator door cover to choose good material before installation.
Third, cleaning the surface of the structure of installation, put in vertical and horizontal.
Fourth, with bench drill, and punch a hole on every board, the drilling, hole location in the middle of the plate, the aperture is 8 millimeter, depth of 12 mm.
Fifth, with the expansion bolt cover the fixed frame, again to hang on the Angle of the rack.
Sixth, the elevator door cover slot of the fixed with marble glue on the pendant.
Seventh, vertical elevation, smooth level off, the seam straight, seam width, 2 mm deviation allowed.
第八、全部安裝完后,要對(duì)電梯門套表面一次性清潔干凈。
Eighth, after the installation, all one-time clean to the elevator door cover surface.
下一篇:石塑電梯門套的做法